Water returns to Tripoli after completion of valve maintenance

By Sami Zaptia.

London, 9 January 2021:

Libya’s Man-made River Authority announced the start of flow of water through the Tripoli network after a halt for a few days due to maintenance work on control valves.

The authority said water will start to flow increasingly but gradually over the next few days.

You must be logged in to post a comment Login